30–60 Ton Crawler Class

Caterpillar Excavator Platforms for Mass Excavation & Aggregate Loading

Heavy-duty rock buckets, documented digging depth and Tier 4 Final powertrains sized for quarry faces, foundation pits and highway cut-and-fill — not brochure adjectives.

  • Bucket 0.9–1.9 m³ HD rock
  • Digging depth up to 7.45 m
  • Engine 130–350 kW · Tier 4 Final
Caterpillar crawler excavator loading aggregate at quarry face

Crawler Excavator — Full Engineering Spec Snapshot

Grouped parameters procurement and site engineers check before locking a weight class for mass earthworks or rock loading duty.

Engine & Emissions
Engine modelCummins / Cat diesel packages · 130–350 kW
Tier 4 Final / Stage VDPF + SCR aftertreatment with NOx/PM log per unit
DEF tank28–40 L depending on class
Hydraulic System
Main pumpDual axial-piston · up to 2 × 220 L/min
System pressure320–350 bar working pressure
CleanlinessISO 4406 18/16/13 from factory flush
Undercarriage / Chassis
Track shoe600–800 mm triple-grouser options
Ground pressure42–55 kPa typical on standard shoes
Rebuild interval8,000 h OEM-spec track group
Boom & Stick / Cab
Boom reach6.1–7.45 m class-dependent
Breakout forceup to 180 kN bucket cylinder
CabROPS + FOPS · ISO 6395 < 75 dB

Six Signals Fleet Managers Verify Before Award

Tier 4 Final, 100% Fleet

EPA and EU Stage V certified across crawler excavator, wheel loader and dozer ranges with documented aftertreatment maps.

ISO 4406 Hydraulic Cleanliness

Every machine ships at 18/16/13 cleanliness with factory pre-flush and on-site fluid sample ports for your reliability log.

Annual Load Chart Re-cert

AS 2550 / ASME B30 inspection packages covering pin gauge, anti-two-block and slew-bearing torque for lift-capable units.

8,000 h Undercarriage Rebuild

OEM-spec track shoes, idlers, sprockets and carrier rollers replaced on a wear-survey schedule before haul-road downtime hits.

22 Quarry-belt Parts Hubs

Certified earthmoving field-service engineers staged for mean-time-to-repair under 18 hours on contracted sites.

ROPS + FOPS Cab

ISO 6395 cab noise under 75 dB with optional 360° camera package and integrated load-moment indicators where required.

12,000Annual units capacity
< 18hMean-time-to-repair
22Regional parts hubs
112Countries served
100%Tier 4 Final fleet

Procurement & Service Questions

Procurement & Logistics

Typical PO-to-site lead time for a crawler excavator?
Standard 20–30 ton excavators ship in 12–14 weeks ex-works plus a seven-day on-site commissioning audit; custom rock buckets or long-reach sticks add 2–3 weeks.
Which Incoterms apply for overseas earthworks fleets?
FOB at major export ports is standard; CIF and DAP are available when freight consolidates with undercarriage and attachment kits.
Country compliance packs for Africa and LATAM?
EPA, CE, GOST-R and INMETRO documentation issued on request with serial-matched emissions certificates.

Service & Spare Parts

Field-service response on contracted sites?
Mean-time-to-repair under 18 hours via 22 quarry-belt regional hubs stocking hydraulic, undercarriage and attachment SKUs.
When should an undercarriage rebuild be planned?
Around 8,000 operating hours, or earlier if wear surveys show rail and sprocket wear beyond OEM limits on abrasive haul roads.
Do you support hydraulic oil cleanliness programs?
Yes — ISO 4406 sampling SOPs, return-line filter kits and cleanliness trend reports for reliability engineers of record.

Engineering Resource Library

Spec sheets, duty-cycle charts and emissions audit samples procurement teams attach to tender responses.

Spec Sheets
  • 20 t Crawler Excavator Spec Sheet (PDF)
  • 30 t Crawler Excavator Spec Sheet (PDF)
  • Wheel Loader Mid-Class Spec Sheet (PDF)
Duty-Cycle & Performance Charts
  • Bucket fill factor — clay vs aggregate (PDF)
  • Cycle-time curves for mass excavation (PDF)
  • Gradeability and ground-pressure map (PDF)
Tier 4 Final Audit Reports
  • Sample emissions audit pack (PDF)
  • DPF / SCR maintenance SOP (PDF)
Undercarriage Wear Surveys
  • Annual wear-survey template (XLSX)
  • 8,000 h rebuild checklist (PDF)
Night asphalt paving crew with excavator support fleet

From Spec Sheet to Site — One Earthmoving Partner

Concept-to-commissioning support across excavators, loaders, dozers and road fleets with documented MTTR and parts coverage.

Talk to a Field-service Engineer